Customization: | Available |
---|---|
Type: | Gravity Separator |
Voltage: | Customized |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Introduction To Gold Shaking table
Gold Separator Machine is mainly used to make separations based on the difference of specific gravity of feed materials, reciprocating asymmetrical movement and the stratification performance of the inclined table surface in the lateral water flow with obvious zone of the minerals with different specific gravities on the table, high quality of concentrates produced, convenient operation ,adjustable.
The shaking table is widely used in the selection of tin, tungsten, gold, silver, lead, zinc, tantalum, niobium, iron, manganese, limonite and coal. Our company has the long history of making table concentrator and gold shaker table, and we also continue to research independently on the technology and mechanism of the mining machine on the basis of the origin liner table concentrator.
The Installing and Adjustment of Shaking Table:
1. Carry out to detect bed ministries complying with the requirements of the drawings, parts
2. Lifting bed of the gold shaker table installed in front of the connector and four connected blocks
3. Hammock should prevent the local compression deformation of the side plates and shall collision bed
4. Bed installation, each connected to the screw holes should be aligned
5. Each bond inspection is correctly installed, the empty running 1-2 hours
6. Empty running is completed
1. small parts are wooden box package
2. the major machine nude packing, container, or upon customers' requirement
3. export standard
4. Delivery Time: 15 days for batch goods.
Pre-Sales Service
1) Inquiry and consulting support.
2) Pre-sale service: Freely provide project designing, process designing, choosing suitable equipment for you.
3) View our Factory. Field trips to sell products.
After-Sales Service
1) After acceptance of the equipment, we will draft the construction program and detailed process, and complete the export process.
2) After-sales service: We sent engineer to the scene to guide installation, debugging and training operators.
3) Spare parts and wearing parts will be offered with production cost in 10 years.
Payment Terms
1. Payment: T/T, L/C and so on
2. MOQ: 1set
3. Warranty : 1 years