• High Recovery Rate 30tpd, 50tpd, 100tpd Copper Ore Flotation Process Plant
  • High Recovery Rate 30tpd, 50tpd, 100tpd Copper Ore Flotation Process Plant
  • High Recovery Rate 30tpd, 50tpd, 100tpd Copper Ore Flotation Process Plant
  • High Recovery Rate 30tpd, 50tpd, 100tpd Copper Ore Flotation Process Plant
  • High Recovery Rate 30tpd, 50tpd, 100tpd Copper Ore Flotation Process Plant
  • High Recovery Rate 30tpd, 50tpd, 100tpd Copper Ore Flotation Process Plant

High Recovery Rate 30tpd, 50tpd, 100tpd Copper Ore Flotation Process Plant

Type: Flotation Separator
Voltage: as Per The Plant Site
Material: Carbon Steel
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
High Recovery Rate 30tpd, 50tpd, 100tpd Copper Ore Flotation Process Plant pictures & photos
High Recovery Rate 30tpd, 50tpd, 100tpd Copper Ore Flotation Process Plant
US $58,500 / Set
Min. Order: 1 Set
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2014

Suppliers with verified business licenses

Secured Trading Service
Henan, China
to see all verified strength labels (18)

Basic Info.

Model NO.
Copper Ore Flotation Process Plant
Certification
ISO9001:2008, CE
Energy Saving
Energy Saving
Warranty
1 Year
Color
Multi Color
Customized
Customized
Condition
New
After-sales Service
Send Installation Engineer at Site
Liner
Rubber, Zgmn13cr2
Motor
Xima, Huali etc Famous Brand
Reducer
Tailong, Haona, Guomao
Manufacture Standard
Industrial Standard
Site Installation
Send Engineer
Work Flow Design
Supply by Xkj
Capacity
12-3000tpd
Quality Control
Go Through 5 Steps Before Load
Company Experince
Over 25 Years
Cusont Using Site
Plenty of Customer Using Site for You Visit
Transport Package
Export Fumigation-Free Wooden Cases
Specification
30TPD
Trademark
XKJ
Origin
Zhengzhou City, Henan Province
HS Code
8474209000
Production Capacity
30tpd

Product Description

The advantages of my company:

 From factory establishment, we have been insisting manufacturing full set of beneficiation equipments. With over 20 years' experience, we still enjoy this advantage to give the clients mature workflow, reasonable design, accurate manufacture, best after-service.  If you want to beneficiation ferrous ore or non-ferrous ore, you are luck to choose me- the right one.
High Recovery Rate 30tpd, 50tpd, 100tpd Copper Ore Flotation Process Plant

 

 

 

Small  mining equipment cover: feeder, crusher, ball mill, classifier, vibrating screen, rocking bed, magnetic separator, cylinder mixer, mix tank ,rotary dryer, rotary kiln flotation machine and so on.
High Recovery Rate 30tpd, 50tpd, 100tpd Copper Ore Flotation Process Plant

We can provide full specifications of large and medium-sized mineral machinery, metallurgy equipment and building materials equipment, such as crushing machines, mineral processing equipment, cement production lines, rolling mill equipment, etc.

 

The following work flow are we main manuacture , we also can supply EPC service for you.

 

High Recovery Rate 30tpd, 50tpd, 100tpd Copper Ore Flotation Process Plant

 

 

 


Our factory has been in the line about over 25 years,before is stated -owned enterpriseis certified by ISO9001:2008. There are above 20 engineers to ensure the design, manufacture process, quality of our products and the after-sales service.

 

 


Pls feel free to contact us for more details, our engineers will offer you reasonable advice for you.

Product Advantage:
 
1.ISO9001:2008;CE
2.High Capacity, Low Cost
3.High Recovery Rate 
4.Easy to setup, operate and adjust, customizable
5.Pre-sales: R&D and consulting support
6.After-sale: skills training & spare parts support
7.Simple structure and easy to operate
8.Easy replacement of wear and spare parts


Product picture:

1) PE series jaw crusher and fine jaw crusher( Cone crusher)
High Recovery Rate 30tpd, 50tpd, 100tpd Copper Ore Flotation Process PlantHigh Recovery Rate 30tpd, 50tpd, 100tpd Copper Ore Flotation Process Plant

 

 

 

 

2) Ball mill and Sprial classifier (hydro cyclone)

High Recovery Rate 30tpd, 50tpd, 100tpd Copper Ore Flotation Process PlantHigh Recovery Rate 30tpd, 50tpd, 100tpd Copper Ore Flotation Process Plant

 

 

3) Agitation tank 

High Recovery Rate 30tpd, 50tpd, 100tpd Copper Ore Flotation Process Plant

 

 

4) Flotation machine 

High Recovery Rate 30tpd, 50tpd, 100tpd Copper Ore Flotation Process Plant

 

 

 

1. The extracted ore should be crushed by jaw crusher initially. When it gets the reasonable fineness, it is   transported into ball mill by elevating conveyer and feeder, and is milled by ball mill.

 

 

2. The subtle milled ore gets the next procedure: classification. There is a theory that if the weights of solid particles are different, the sedimentations will be different, and the mixed ore can be classified by screw classifier.

 

3.The classified ore gets into flotation separator, we as per the ore grade and property different medicines are added according to different characteristics of ore, so that the needed ore is separated from others.

In order to make sure the final grade and the concentrate reach the maximum, we need to more stage grinding and flotation , we also will use the vertical mill together with the rod mill.

 

4. Since the separated ore are wet, they should be dewatered by thickener and filter initially, and dried by drier. Finally, the dry minerals come into being. The specific production flow is as the photos.

 

 

 Customer  using site phots:

High Recovery Rate 30tpd, 50tpd, 100tpd Copper Ore Flotation Process PlantHigh Recovery Rate 30tpd, 50tpd, 100tpd Copper Ore Flotation Process PlantHigh Recovery Rate 30tpd, 50tpd, 100tpd Copper Ore Flotation Process Plant

 Our service:
1. Proving beneficiation technology and consultation

  2. Raw ore testing and evaluation

  3. Site chosen consultation and evaluation.

  4. Site design and layout design.

  5. Installation, erection and commissioning instruction

  6. Workers training.

FAQ

 

Please send inquiry for various scales of beneficiation equipments to us, we need to know the following information:

1. Which kind of raw material and the feeding size?

2. The capacity per day

3. The raw ore specific content and percent? (You had better send us analysis report)

4. The grade you want to get

 

 

 

 

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

From payment to delivery, we protect your trading.
High Recovery Rate 30tpd, 50tpd, 100tpd Copper Ore Flotation Process Plant pictures & photos
High Recovery Rate 30tpd, 50tpd, 100tpd Copper Ore Flotation Process Plant
US $58,500 / Set
Min. Order: 1 Set
Diamond Member Since 2014

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory & Trading Company
Number of Employees
98
Year of Establishment
1997-12-17