Customization: | Available |
---|---|
Type: | Flotation Separator |
Voltage: | as Per The Plant Site |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
We can supply 12-3000TPD capacity for you choose
Our company supply high quality mineral processing equipment which is very popular both at home and abroad.
Recenlty Our client case:
We have set up 1200TPD gold ore CIL plant in Tanzania,
3000TPD iron ore in Peru,
300TPD and 1500TPD copper ore processing line in Zambia,
300TPH sand iron ore processing line in Indonesia,
500TPD copper ore processing line in Mexico
600TPD silver ore processing line in Morocco
750TPD graphite ore processing line in Madagascar
250TPD copper ore processing line in Romania
100TPD graphite ore processing line in Namibia
25TPD Lab graphite ore processing line in South Korea
30TPD lab copper ore processing line in Brzil
25TPD Lab copper ore processing line in Pakistan
400TPD copper cobalt ore processing line in Congo
Small mining equipment in Russia, South africa, Mongolia, Panama, Zimbabwa, USA, Australia, Nigeria, Uganda, Kenya, Indonesia, Philippline etc
We have different capacity beneficiation plant at home and abroad:
30TPD copper ore processing line
50TPD copper ore processing line
100TPD copper ore processing line
300TPD copper ore processing line
500TPD copper ore processing line
If you interesting in our beneficiation equipments, pls fell free to contact me, and inform us the following details:
1. the max feeding size
2. the capacity per hour or day
3.the ore grade
4. your other demand
Mineral processing equipment introduction
This Ore beneficiation and upgrading line is very practical for small and middle mine owner to upgrading the ore grade.
Basic Process of copper ore beneficiation and upgrading plant
1) The ore is first sent to the jaw crusher for primary crushing.
2) Then the ore with a proper size for secondary crushing fine crusher, or cone crusher to get the <25mm site, then through betlt conveyor will be sent into the ball mill for fine crushing and grinding.
For big capacity, in order to save energy, the ball mill feeding size will be reach <12mm, we use three stage crushing, such as Jaw crusher---fine crusher----vibraring screen-----cone cusher-----vibrating screen or Jaw crusher---vibraring screen-----cone crusher---cone crusher-----vibrating screen
3) The fineness powder discharged from the ball mill will be flow into the next procedure: classifying., the ball mill and classfier will be form a closed circuit, the big size will go to ball mill for regrinding.
4) Because of the different sedimentation rate due to the varied specific gravity, spiral classifier can clean and group the ore mixture. Sometimes, we also use will hydro cyclone instead of spiral classifier.
5) Then the mixture is sent to mixer, we will add chemical here and flow into flotation machine. According to the features of different ores, we can add different additive into the mixture to separate the ore which we want from the mixture.
6) After the seperation from the mixture, the ore we want always contains a lot of water, then we need a thickner to have it concentrated and then filter and dried by a drier, enventually we can get dry concentrate ore.
General process:
♦ Primary crushing (Jaw crusher)
♦ Secondary crushing (Fine jaw crusher)
♦ Screening (Vibrating screen)
♦ Third crushing (Fine jaw crusher) or (Cone crusher)
♦ Grinding (wet Ball mill)
♦ Classifying (Sprial classifier or hydro cyclone or High frequency vibrating screen)
♦ Ore separating ( Flotation machine/ Magnetic seperator/ Shaking table )
♦ Concentrating (Concentrator)
♦ Drying (thickener, filter, Rotary dryer)
Dry Copper concentrate:
Our services
1. Ore laboratory test
2. Ore beneficiation test
3. Flowchart designing and layout designing.
4. Full set of machines
5. Erecting and commissioning
6. Training
7. Technical consolation
8. End products selling
In a world, we can do EPC for you,for the mineral processing experiment to the final product produced, we can send one team work in charge of the plant operation.
The advantages of my company:
From factory establishment, we have been insisting manufacturing full set of beneficiation equipments. With over 20 years' experience, we still enjoy this advantage to give the clients mature workflow, reasonable design, accurate manufacture, best after-service. If you want to beneficiation ferrous ore or non-ferrous ore, you are luck to choose me- the right one.
Customer using site phots: