Customization: | Available |
---|---|
Model: | Φ0.6×8 |
Object: | Sand |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Model | Diameter of outer cylinder(m) | Length of outer cylinder (m) | Drum volume(m³) | Rotation speed(r/min) | Max. air flow temperature(ºC) | Production capacity(t/h) | Power(kw) |
2.0*4m | 2 | 4 | 12.56 | 4-10 | 700-750 | 8-15 | 5.5x2 |
2.2*5m | 2.2 | 5 | 18.99 | 4-10 | 700-750 | 12-20 | 5.5x2 |
2.5*6m | 2.5 | 6 | 29.43 | 4-10 | 700-750 | 18-28 | 7.5x2 |
2.8*6m | 2.8 | 6 | 36.92 | 4-10 | 700-750 | 25-35 | 11x2 |
3.0*6m | 3 | 6 | 42.39 | 4-10 | 700-750 | 30-40 | 7.5x4 |
3.0*7m | 3 | 7 | 49.45 | 4-10 | 700-750 | 30-45 | 7.5x4 |
3.2*7m | 3.2 | 7 | 56.27 | 4-10 | 700-750 | 35-55 | 11x4 |
3.6*8m | 3.6 | 8 | 81.39 | 4-10 | 700-750 | 55-75 | 18.5x4 |
4.0*10m | 4 | 10 | 125.60 | 4-10 | 700-750 | 70-100 | 22x4 |
Henan Xingyang Mining Machinery Factory was established in 1996 . Is engaged in mineral processing equipment, product development, engineering and production and sales of new technology enterprises. Enterprises adhere to the implementation of entrepreneurial talent , science and technology, quality in setting development strategy, according to domestic and international market situation, based on the original mineral processing equipment ( crusher, ball mill , flotation machine, magnetic separator , dryer , etc. ) , actively the introduction of advanced high-tech , research and development of a series of energy-saving ball mill , MQG ball mill, flotation machine series , stirred tank , pellet equipment ( Run mill , rotary kiln, balling plate , cooler, coal mill ) and magnesium production line ( zinc oxide production line, limestone lines ) and other products with the leading domestic level , some products have reached the international advanced level.
Service commitment
We are committed to providing timely, rapid, and efficient services for each of our customers.
Rapid reply within 30 minutes
To the issue you consult about, or the feedback from you, we are sure to make reply within 30 minutes to have effective communication.
Providing solution design within 24 hours
According to the results of communication with you, we will within 24 hours provide a design solution, or a solution handling your feedback or e-mail.
Dispatching engineers within 24/72 hours
If we decide to dispatch engineers to support your production, we commit ourselves to dispatching them within 24/72 hours domestically/abroad.
Q:Are you manufacturer?
A:Yes,we are manufacturer.We have our own technical team.Welcome to visit us.
Q:What kind o f payment term you can do?
A:We are flexible about payment terms,we can also help you on financing, please contact us for details.
Q:What info you need before you make the proposal?
A:The pipe diameter and thickness range which you need or the profile drawings,material information,your special requirements.
Q: What should I do if I just start a new business?
A:Contact us immediately ,we provide free consultant pre-sales service.Also we can help you to solve the material purchase,worker train,international market price.