High Recovery Rate 100tpd Gold Ore Processing Plant

Product Details
Customization: Available
Type: Flotation Separator
Voltage: as Per The Plant Site
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory & Trading Company

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2014

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
Self-branded
The supplier has 2 Self-brands, check the Audit Report for more information
to see all verified strength labels (18)
  • High Recovery Rate 100tpd Gold Ore Processing Plant
  • High Recovery Rate 100tpd Gold Ore Processing Plant
  • High Recovery Rate 100tpd Gold Ore Processing Plant
  • High Recovery Rate 100tpd Gold Ore Processing Plant
  • High Recovery Rate 100tpd Gold Ore Processing Plant
  • High Recovery Rate 100tpd Gold Ore Processing Plant
Find Similar Products

Basic Info.

Model NO.
100TPD gold ore processing plant
Material
Carbon Steel
Certification
ISO9001:2008, CE
Energy Saving
Energy Saving
Warranty
1 Year
Color
Multi Color
Customized
Customized
Condition
New
After-sales Service
Send Installation Engineer at Site
Liner
Rubber, Zgmn13cr2
Motor
Xima, Huali etc Famous Brand
Reducer
Tailong, Haona, Guomao
Manufacture Standard
Industrial Standard
Site Installation
Send Engineer
Work Flow Design
Supply by Xkj
Capacity
12-3000tpd
Quality Control
Go Through 5 Steps Before Load
Company Experince
Over 25 Years
Cusont Using Site
Plenty of Customer Using Site for You Visit
Transport Package
Export Fumigation-Free Wooden Cases
Specification
100TPD
Trademark
XKJ
Origin
Zhengzhou City, Henan Province
HS Code
8474209000
Production Capacity
30tpd

Product Description

The advantages of my company:

 From factory establishment, we have been insisting manufacturing full set of beneficiation equipments. With over 25 years' experience, we still enjoy this advantage to give the clients mature workflow, reasonable design, accurate manufacture, best after-service.  If you want to beneficiation ferrous ore or non-ferrous ore, you are luck to choose me- the right one.
High Recovery Rate 100tpd Gold Ore Processing Plant

 

Small  mining equipment cover: feeder, crusher, ball mill, classifier, vibrating screen, rocking bed, magnetic separator, cylinder mixer, mix tank ,rotary dryer, rotary kiln flotation machine and so on.

 



We can provide full specifications of large and medium-sized mineral machinery, metallurgy equipment and building materials equipment, such as crushing machines, mineral processing equipment, cement production lines, rolling mill equipment, etc.

High Recovery Rate 100tpd Gold Ore Processing Plant

 


Our factory has been in the line about over 20 years,before is stated -owned enterpriseis certified by ISO9001:2008. There are above 20 engineers to ensure the design, manufacture process, quality of our products and the after-sales service.

 

 


Pls feel free to contact us for more details, our engineers will offer you reasonable advice for you.

Product Advantage:
 
1.ISO9001:2008;CE
2.High Capacity, Low Cost
3.High Recovery Rate 
4.Easy to setup, operate and adjust, customizable
5.Pre-sales: R&D and consulting support
6.After-sale: skills training & spare parts support
7.Simple structure and easy to operate
8.Easy replacement of wear and spare parts


Product picture:

1) PE series jaw crusher PE250X400 and fine jaw crusher PEX150X750
High Recovery Rate 100tpd Gold Ore Processing Plant

High Recovery Rate 100tpd Gold Ore Processing Plant

 

Swaing feeder BK400X400 :

High Recovery Rate 100tpd Gold Ore Processing Plant

 

2) Ball mill 1500X3500 and Sprial classifier FLG1200 (hydro cycloneFX200-3)

High Recovery Rate 100tpd Gold Ore Processing Plant

 

3) Agitation tank XB1500

High Recovery Rate 100tpd Gold Ore Processing Plant

 

 

4) Flotation machine SF1.2, SF0.65:

 

High Recovery Rate 100tpd Gold Ore Processing PlantHigh Recovery Rate 100tpd Gold Ore Processing Plant

 

 

 

1. The extracted ore below 210 mm should be crushed by jaw crusher PE250X400 by chute feeder CG600X500 continuous and evenly, the chute feeder put under the hopper, the  crushed ore feed to the fine jaw cruser PEX150X750 by belt conveyor , the discharge size will transport to the hopper.

 

The crushed ore usually reach <25mm, the crushing part one day works 8-10 hours, it work at day time, at night , the crushered ore will be store in the hopper.

 

 

 

2. The crushed ore usually is <25mm will through the swaying feeder  BK 4000X400 or electricvibrating feeder GZ-2 feeder to the ball mill,accroding to the feeder and ball mill distance and terrain, sometime we also need to add one belt conveyor , the crushed ore feed to the ball mill for grinding. 

The ball mill 1500x3000 or 1500x3500 and spiral classifier  FLG1200 or hydro cyclone will formed a closed circulte, the bigger size discharge from the classifier or hydro cyclone will retrrn to the ball mill for regrinding , the suitable size will flow to the mixing tank.

 

There is a theory that if the weights of solid particles are different, the sedimentations will be different, and the mixed ore can be classified by screw classifier.

 

3.The slurry will flow into flotation separator, we as per the ore grade and property different 

chemical are added according to different characteristics of ore, so that the needed ore is separated from others.

 

4. Since the separated ore are wet, they should be dewatered by thickener and filter initially, and dried by drier. Finally, the dry minerals come into being. The specific production flow is as the photos.

 

 

 Customer  using site phots:

High Recovery Rate 100tpd Gold Ore Processing PlantHigh Recovery Rate 100tpd Gold Ore Processing PlantHigh Recovery Rate 100tpd Gold Ore Processing Plant

 

 

 

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier