Gold Member Since 2014
Audited Supplier
Henan Xingyang Mining Machinery Manufactory

Gold Ore Extraction Plant, Gold Ore Processing Plant, Gold Ore Processing Line manufacturer / supplier in China, offering Manufacture Turnkey Project Gold Ore Extraction Plant, 2017 New Professional Manufacturer Copper Ball Mill Machine, Gold Ball Mill Machine, 2017 New Complete Set 200-1800 Tpd Gold Mining Ball Mill Processing Plant and so on.

(/ )

Supplier Homepage Product Flotation machine Manufacture Turnkey Project Gold Ore Extraction Plant

Manufacture Turnkey Project Gold Ore Extraction Plant

FOB Price: US $485,300 / plant
Min. Order: 1 plant
Min. Order FOB Price
1 plant US $485,300/ plant
Get Latest Price
Production Capacity: 1 Plant Per Month
Transport Package: Export Standard Container 20gp or 40gp, 40hr etc
Payment Terms: L/C, T/T, Paypal, Money Gram, Western Union

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Type: Beneficiation Machinery
  • Weight: >10T
  • Material Feature: Wear Resistance
  • Energy Saving: Energy Saving
  • Color: Green
  • Condition: New
  • Certificate: Passed ISO9001:2008
  • Install,Debag and Training: Free Installation Guidance and Lines Design
  • Maintenance: Few Time
  • Manufacture Standard: Accord with Industrial Standard
  • Specification: SGS, BV, CE, ISO
  • HS Code: 84741000
  • Voltage: 380V
  • Material: Q235, Cast Steel, Channel Steel, Cast Steel
  • Certification: BV, ISO9001:2008, CE
  • Warranty: One Year Warranty Except Wearing Parts
  • Customized: Customized
  • Delivery: in Time
  • Quality Control: Go Through Five Checks Before Delivery
  • Operation: Easy and Simple
  • After Sale Service: Praised by Our Users
  • Trademark: XKJ
  • Origin: Zhengzhou City, Henan Province, China
Product Description

Introduction of Turnkey Project Gold Ore Extraction Plant For Processing

XKJ company supply Turnkey Project Gold Ore Extraction Plant For Processing covers feeders, crushers, ball mills, classifiers, vibrating screens, belt conveyors, magnetic separators, mixing tanks, flotation machines, jigger machines, leaching equipments, desorption electrowinning machines, filters and so on.

 

Features of Turnkey Project Gold Ore Extraction Plant For Processing:

a. Mineral testing Support 
b. Suitable machines suggest 
c. Plant design 
d. Installation
e. Commissioning 

f. Management

g. After-sale services

 Turnkey Project Gold Ore Extraction Plant For Processing:

The raw ore should be crushed by jaw crusher initially.

 

 

When it gets the reasonable fineness, it is transported into ball mill by elevating conveyer and feeder, and is milled by ball mill.

 

 

The subtle milled ore gets the next procedure: Classification. There is a theory that if the weights of solid particles are different, the sedimentations will be different,

and the mixed ore can be classified by spiral classifier.

 

 

The classified ore will be transported into flotation machine by conveyer,and different medicines are added according to different characteristics of ore, so that the needed ore is separated from others. And gold concentrates after flotation machine could be sent to smelting plant to get gold.

 

 

Since the separated ore are wet, they could be dewatered by thickner initially, or dried by dryer.

 

 

When using cyanide leaching process, after thickening, pulp with fine ore could be processed in agitation tanks and leaching tanks for carbon adsorption and leaching.

 

 

Loaded-carbon after the adsorption and leaching would be sent into desorption and electrowinning cell to get gold.

 

 

 

Turnkey Service Gold Recovery plant produced by our company can provide you with all-around technical support.

According to different customers and different mine, my company design different beneficiation complete sets of equipments for you.

We can offer complete sets of slecting iron, gold, copper, lead, tungsten, etc equipments.

We also offer single machine of above and have supplied complete set of mechanical equipments for clients all over the world.

 

 

Packaging & Shipping

Generally,we adopt standard containers, bare main machine, motors and small parts are packed in wooden cases.

 
Shippment of Turnkey Project Gold Ore Extraction Plant For Processing:

Our Services

We, Henan Xingyang Mining Machinery Manufactory can provide customers with ore test, beneficiation plant design, equipments manufacturing, installation, commissioning maintenance service for all kinds of nonferrous metals, ferrous metals, and gold mine.

Gold Equipment
Our cases:
ALashan mining                   1000tpd copper lead zinc
Indian metal                           2000tpd iron mine
Michilane mining                   4000tpd iron
Busair Mining invest             3000tpd iron
Big bay copper mine            300tpd copper
Mongolian baier Mining       3000lead zinc
Honours iron mine                8000tpd iron
Indonesia gold mine             3000tpd gold

Turnkey Project Gold Ore Extraction Plant For Processing
Manufacture Turnkey Project Gold Ore Extraction Plant

 
Company Information

Our company was established in 1996  in the zhengzhou city. With 20 years rich mining equipments experience has distinguished the Company as a respected mining beneficiation machinery solution supplier, and have become the strength beneficiation mining equipment's manufacture in Henan area, supported by the biggest gold mine in China.   

Turnkey Project Gold Ore Extraction Plant For Processing
Manufacture Turnkey Project Gold Ore Extraction Plant

 


Manufacture Turnkey Project Gold Ore Extraction Plant

 

 

 

  
 

Send your message to this supplier
Avatar
Ms. Katherine
Sales
*From:
To: Ms. Katherine
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now